Knowledge Sprint SeriesMT24 Learning

Phase 1 · Summary · Sprints 1–3 of 90

Engineering Foundations

Version control, hashing, secure access and quality gates: three sprints, every claim checked against official sources.

3 sprints, hands-onVerified sourcesOne phase project

Phase 1 summary, a one-page catalog: Engineering Foundations. The full text of the page follows.
Full resolution2160 × 2700 PNGPhase on GitHub

The part of the image you are reading lights up. Tap a part to jump to its text.

Figure in words

  • a laptop screen: $ git log --oneline
  • a1f9c3e add quality gates
  • 7be20d4 connect over SSH
  • 3c5a1f0 first snapshot
  • $ pytest passed ✓
  • a stack of four blocks: Git · Hashing · SSH · Gates

The Sprints

Git Foundations

Snapshots, not diffs. Blob, tree and commit form a graph.

Sprint 1

Hashing in Git

One changed character, a new hash. SHA-1 by default, SHA-256 opt-in.

Sprint 2

GitHub over SSH

An ed25519 key pair. Only the .pub file ever leaves the machine.

Sprint 2

Project Structure

Code in src/, tests in tests/, settings in one pyproject.toml.

Sprint 3

Quality Gates

Format, lint, types, tests. CI repeats what hooks can skip.

Sprint 3

Now I Can Outcome

Build a versioned repo, push over SSH, stop bad code at the gate.

Mistakes Avoided Lessons

Vague commits, leaked keys, the SHA-256 myth, loose-file tests.

Phase Project

One repo on GitHub over SSH, gates on, a fresh clone that passes.

R Trusted Sources

  1. Pro Git
  2. NIST FIPS 180-4
  3. GitHub Docs
  4. PyPA Guide
  5. pytest documentation

The Sprint Pages

  1. Sprint 1/90Environment + Git Foundations
  2. Sprint 2/90Hashing + GitHub over SSH
  3. Sprint 3/90Project Structure & Quality Gates

Cite this phase

Tahri, M. (2026). MT24 Learning — Knowledge Sprint Series, Phase 1: Engineering Foundations (Version 1.0) [Educational resource]. Zenodo. https://doi.org/10.5281/zenodo.22979790

Version DOI 10.5281/zenodo.22979790 · all versions 10.5281/zenodo.22979789 · first published 19 September 2026